Short-Term Scheduling for Large-Scale Cascaded Hydropower Systems with Multivibration Zones of High Head

Hits:

Indexed by:期刊论文

Date of Publication:2012-05-01

Journal:JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE

Included Journals:SCIE、Scopus

Volume:138

Issue:3

Page Number:257-267

ISSN No.:0733-9496

Key Words:Multivibration zones; Short-term scheduling; Peak load regulation; Large-scale hydropower system

Abstract:Construction of huge hydropower plants in the southern region of China has been rapidly increasing in recent years. These plants usually have multiple vibration zones of high head that have a great effect on short-term scheduling and real-time operations. This paper presents a novel approach for optimizing short-term scheduling of large-scale cascaded hydropower systems with multivibration zones of high head. For the purpose of cutting down peak loads, standard deviation minimization relevant to the remaining load series for thermal systems was chosen as the objective nonlinear function. Before the optimization, unit forbidden operation zones were identified by assembled mathematical techniques and hydro unit commitments were optimized using dynamic programming. The combined sets of forbidden operation zones and hydro unit commitments were repeatedly used during the search process. An optimization framework that combined the progressive optimality algorithm with a vibration zone avoidance strategy was finally presented to solve the short-term hydropower scheduling problem. The proposed methodology was applied to a case study in China and the results obtained indicate that it is able to not only handle complex constraints of multivibration zones, but also provide efficient and feasible solutions for short-term scheduling of large plants. DOI: 10.1061/(ASCE)WR.1943-5452.0000174. (C) 2012 American Society of Civil Engineers.

Pre One:大规模小水电群一体化发电计划编制方法

Next One:自适应混合粒子群算法在梯级水电站群优化调度中的应用