Hits:
Date of Publication:2022-10-02
Journal:International Symposium on Reliability Engineering and Risk Management (ISRERM2010)
Affiliation of Author(s):运载工程与力学学部
Pre One:Further Study on Efficiency of Sequential Approximate Programming for Probabilistic Structural Design Optimization
Next One:Discussion of mathematical models of probabilistic constraints calculation in reliability-based design optimization