燃气蒸汽联合循环底循环全工况设计分析

Hits:

Date of Publication:2022-10-06

Journal:燃气轮机技术

Affiliation of Author(s):能源与动力学院

Issue:3

Page Number:38-43

ISSN No.:1009-2889

Abstract:With urgent requirements of high efficiency and low pollution of energy utilization, gas-steam combined cycle is widely used in power station.In this paper, based on gas turbine design condition, a triple pressure without reheat steam bottom cycle system is established and parameters matching between different pressure steam and reasonable design of bottom cycle are carried out.On this basis, the performance analysis of steam bottom cycle at all operating condition is conducted.As for vaporization problem at exit of the economizer at part-load condition, some of original parameters are designed again as one solution and the bottom cycle process is partly improved as another solution.

Note:新增回溯数据

Pre One:Comparative Analysis of CCHP Systems Based on Different Gas Turbine Cycles Applied in North of China

Next One:燃气-蒸汽联合循环底部循环变工况求解