Title of Paper:基于微震监测的地下水封石油洞库施工期围岩稳定性分析
Hits:
Date of Publication:2022-10-10
Journal:岩石力学与工程学报
Volume:35
Issue:7
Page Number:1353-1365
ISSN No.:1000-6915
Abstract:The real-time monitoring and analysis of the microseismic activities of
the cave rocks of a large underground water-sealed oil storage cavern in
Jinzhou during the disturbance caused by strong excavation were
performed using the Canadian ESG monitoring system. The potential
failure regions of the cave rocks within the scope of monitoring were
identified. The initiation,development and agglomeration process of the
rock micro-cracks during excavation were reproduced. The P wave velocity
was determined to be 5 200 m/s with the error of source location less
than 8 m within the scope of the sensor array. Micro-cracks of rocks
within the scope were aggregated into two bands. One was located to the
east of water curtain tunnel 6,in between the water curtain tunnels 1
and 2,and had a low angle with the horizontal plane. The other was
located in 2+40-2+60 mileage between the oil storage grotto 1-North and
1-South,and shared the same distribution with the diabase dikes in the
region. The microseismic monitoring system identified the condition of
the weak structural surface like dikes. The strong excavation
disturbance of the large section oil storage caverns and the release of
large amount of energy led to theover damageof rock and resulted in a
large number of micro-cracks. The research results proved the
feasibility of applying the microseismic monitoring technology in the
special rock mass structures like underground water-sealed oil storage
caverns.
Note:新增回溯数据
Open time:..