糯扎渡水利工程进度方案综合评价研究
点击次数:
发表时间:2022-10-06
发表刊物:水利科技与经济
所属单位:建设工程学部
期号:10
页面范围:97-99,102
ISSN号:1006-7175
摘要:Large-scale hydraulic engineering projects are often characterized by long and difficult construction work , during which many factors that tend to hamper the construction progress exist.As such , it is extremely important to make a feasible schedule plan at an early stage of the project.This article is grounded on the Nuozhadu Hydraulic Project to compare the three early -stage schedule plans and identify significant inhibitors of construction progress.Based on these findings , the evalua-tion indicator system for the Nuozhadu Hydraulic Project schedule plans are established , and entropy weight analysis and linear weighted methods are used for evaluation.Additionally , this study con-ducts the variable weight analysis on established indicators , the results of which can serve as the ref-erence for selecting construction schedule plans of other projects.
备注:新增回溯数据