Release Time:2024-01-08 Hits:
Date of Publication: 2022-10-04
Journal: 3rd International Conference on Civil Engineering, Architecture and Building Materials
Institution: 建设工程学部
Page Number: 357-360
Prev One:Analysis of prominent problems existing in construction domain of China and study on institutionalized and informatized solutions
Next One:A LITERATURE REVIEW OF THE FACTORS LIMITING THE APPLICATION OF BIM IN THE CONSTRUCTION INDUSTRY