史彦军
开通时间:..
最后更新时间:..
点击次数:
论文类型:期刊论文
第一作者:Shi Y.-J.
通讯作者:Shi, Y.-J.; School of Mechanical Engineering, Dalian University of Technology, Dalian 116024, China
合写作者:Shen G.-J.,Chen W.
发表时间:2011-01-01
发表刊物:Information Technology Journal
收录刊物:EI、Scopus
卷号:10
期号:7
页面范围:1374-1380
ISSN号:18125638
摘要:School of Mechanical Engineering, Dalian University of Technology, Dalian 116024, People's Republic of China The Resource-Constrained Project Scheduling Problem (RCPSP) is aNP-hard problem in information engineering. The activities of a project have to be scheduled for satisfying all the precedence and resource constraints. We presented a heuristicalgorithm (EDAS) to deal with this problem which employed an estimation of distribution algorithm (known as EDA) and improved the local search capacity with a simplex search. In this algorithm, the EDA firstly searched the solution space and generated activity liststo provide the initial population; then, the EDA selected the sample solutions to build a probability distribution model. The new individual was generated by sampling this model. The simplex search was used to enhance the local search capacity of the EDA. Compared with state-of-the-art algorithms available in the literature, we showed the effectiveness of this approach empirically on the standard benchmark problems of size J60 and J120 from PSPLIB. ? 2011 Asian Network for Scientific Information.