扫描手机二维码

欢迎您的访问
您是第 位访客

开通时间:..

最后更新时间:..

  • 王建军 ( 教授 )

    的个人主页 http://faculty.dlut.edu.cn/wjj/zh_CN/index.htm

  •   教授   博士生导师   硕士生导师
论文成果 当前位置: 中文主页 >> 科学研究 >> 论文成果
Single machine group scheduling with time dependent processing times and ready times

点击次数:
论文类型:期刊论文
发表时间:2014-08-10
发表刊物:INFORMATION SCIENCES
收录刊物:SCIE、EI、Scopus
卷号:275
页面范围:226-231
ISSN号:0020-0255
关键字:Scheduling; Single machine; Start time dependent processing time; Group technology; Ready time
摘要:In this paper we investigate a single machine scheduling problem with time dependent processing times and group technology (GT) assumption. By time dependent processing times and group technology assumption, we mean that the group setup times and job processing times are both increasing functions of their starting times, i.e., group setup times and job processing times are both described by function which is proportional to a linear function of time. We attempt to minimize the makespan with ready times of the jobs. We show that the problem can be solved in polynomial time when start time dependent processing times and group technology are considered simultaneously. (C) 2014 Elsevier Inc. All rights reserved.

 

辽ICP备05001357号 地址:中国·辽宁省大连市甘井子区凌工路2号 邮编:116024
版权所有:大连理工大学