程春田

个人信息Personal Information

教授

博士生导师

硕士生导师

性别:男

毕业院校:大连理工大学

学位:博士

所在单位:水利工程系

学科:水文学及水资源. 水利水电工程. 电力系统及其自动化. 计算机应用技术

联系方式:ctcheng@dlut.edu.cn

电子邮箱:ctcheng@dlut.edu.cn

扫描关注

论文成果

当前位置: 中文主页 >> 科学研究 >> 论文成果

Power Generation Scheduling for Integrated Large and Small Hydropower Plant Systems in Southwest China

点击次数:

论文类型:期刊论文

发表时间:2017-08-01

发表刊物:JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT

收录刊物:Scopus、SCIE、EI

卷号:143

期号:8

ISSN号:0733-9496

关键字:Large hydropower plants (LHPPs); Small hydropower plants (SHPPs); Transmission constraints; Coordination; Electricity absorption; Spilled electricity reduction

摘要:Electric power transmission lines in service in southwest China have fallen far behind the power sources. With rapid development of hydropower in this area, severe water spills for hydropower frequently occur during the flood season because of limited transmission capacity. Effective coordinated operation among large and small hydropower plants (LHPPs and SHPPs) in the area is a feasible approach for alleviating this problem. Using the Yunnan Power Grid (YNPG) of southwest China as an example, a long-term coordinated optimal operation model (COOM) for an integrated system of LHPPs and SHPPs is proposed in this paper. Total electricity that can be consumed or transmitted is defined as electricity absorption. Maximizing the total electricity absorption, which implies balancing high average water heads with reservoir spills, was selected as the objective. Satisfying multiple voltage transmission constraints is a critical issue. A progressive optimality algorithm (POA) was used to solve the model based on a multidimensional search in two-stage optimizations. Results from the YNPG case study show that the proposed method can achieve greater total electricity absorption while effectively reducing spillage. (C) 2017 American Society of Civil Engineers.