Release Time:2019-03-11 Hits:
Indexed by: Conference Paper
Date of Publication: 2008-10-05
Included Journals: Scopus、CPCI-S、EI
Page Number: 1040-+
Key Words: shipbuilding process; dynamic production plan; physical distribution; simplified simulated annealing algorithm
Abstract: To reduce the costs and lead time for shipbuilding, an integrated system is proposed to optimize a long term production plan, as well as the node plan and the physical distribution plan. A hierarchical architecture and the object-oriented technology are used to incorporate all critical information such as production capacities. A physical distribution algorithm is developed assuming the material quantities consumed follow normal distribution. A simplified simulated-annealing algorithm is presented to increase the planning optimization speed. The system was tested as feasible and effective in a case study conducted at the Dalian Shipbuilding Industry Co., Ltd. in China.