Indexed by:期刊论文
Date of Publication:2015-01-01
Journal:international journal of earth sciences and engineering
Included Journals:EI、Scopus
Volume:8
Issue:1
Page Number:371-375
Abstract:How to solve the problem that the working load is always unbalanced in the general assembly shipbuilding process is the key to improve the production efficiency. This problem can be solved by optimizing the shipbuilding process using the theory of takt time of the pipelining production process. This article combines the characteristics of the general assembly shipbuilding process, proposes a prime principle for the hull blocks production design; and on this basis, optimizes the theory model of general assembly shipbuilding process, constructs the hull blocks takt time and quantity of the hull blocks buffer inventory calculation method, and analyzes the effects of the applying the takt time by comparing the actual record and the calculated result of a shipyard. The result shows that the production efficiency and the production resources coefficient of utilization are improved obviously and the target of optimizing the shipbuilding process is achieved. ? 2014 CAFET-INNOVA TECHNICAL SOCIETY. All rights reserved.