location: Current position: Home >> Scientific Research >> Paper Publications

基于非均匀间隙的充水保压蜗壳施工仿真分析

Hits:

Indexed by:期刊论文

Date of Publication:2022-06-29

Journal:水力发电学报

Volume:28

Issue:4

Page Number:75-80

ISSN No.:1003-1243

Abstract:This paper presents a simulation of the construction process of a constant internal pressure spiral case with non-uniform gap of hydropower stations, through ABAQUS FEM computation with consideration of the case contact with the peripheral reinforced concrete. In addition, simulations of the turbine operation stage show the time variation of the gap opening and the property of the case-concrete contact. A detailed analysis is given on the time variation of characteristic stresses in the spiral case, the reinforcement as well as the concrete. By comparing with the simplified simulation, it is concluded that the full simulation is of more practical value and that the simulation results obtained for a real project are reasonable, which could be useful for both construction monitoring and safety evaluation on long-term operation of the constant pressure spiral case.

Note:新增回溯数据

Pre One:基础、导轴承刚度和磁拉力等对机组自振特性的影响

Next One:基于非均匀间隙的充水保压蜗壳施工仿真分析. ,2009,28(4):75-80