传感器优化布设在水电站厂房振动特性研究中应用

Hits:

Date of Publication:2006-01-01

Journal:大连理工大学学报

Affiliation of Author(s):建设工程学部

Issue:2

Page Number:262-266

ISSN No.:1000-8608

Abstract:The vibration of the power house in hydropower station becomes a much more serious problem. In order to satisfy the need of analyzing the cause of machine vibration and oscillating load in hydropower station, several optimal sensor placement criterions are summed up and the BDA (backward deletion algorithm) is introduced into the practical application. Based on the ANSYS-APDL a Fortran program is written for the special structure problem in hydropower station. The power house of Hongshi Hydropower Station is taken as an real example and the FEM model is established for the vibration identification and the optimal design of sensor placement. It is found that taking into consideration only the first two vibration modes of the power house is enough for the dynamic analysis. The method proposed here can provide more reliable information for the dynamic characteristics analysis in the hydropower station.

Note:新增回溯数据

Pre One:仙居抽水蓄能电站地下厂房振动数值模拟分析与安全评价

Next One:冲击式水轮机配水环管结构分析与设计优化