Release Time:2019-03-11 Hits:
Indexed by: Journal Article
Date of Publication: 2011-06-17
Journal: Lecture Notes in Electrical Engineering
Included Journals: Scopus、EI
Volume: 126 LNEE
Issue: VOL. 3
Page Number: 373-381
ISSN: 9783642257650
Abstract: Traditional CRP(Capacity Requirements Planning) algorithm can not compute production capacity requirements precisely. We design a scheduling algorithm based on Heuristic Rules and use it to form a new CRP Algorithm which results in computing production capacity requirements precisely. The new definitions of Machine Load Ratio, Key Machine and Key Job indicate more realistically forecasting operation situation in planning horizon. Arithmetic computing complexity of the scheduling algorithm determines that the new CRP Algorithm is feasible. © Springer-Verlag Berlin Heidelberg 2012.