武新宇
个人信息Personal Information
教授
博士生导师
硕士生导师
性别:男
毕业院校:大连理工大学
学位:博士
所在单位:水利工程系
学科:水文学及水资源. 水利水电工程
联系方式:wuxinyu@dlut.edu.cn
电子邮箱:wuxinyu@dlut.edu.cn
扫描关注
- [1]Wu, Xinyu, Cheng, Chuntian, Lund, Jay R., Niu, Wenjing, Miao, Shumin, CT (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China., Cheng, Minist Educ, Key Lab Ocean Energy Utilizat & Energy Conservat.Stochastic dynamic programming for hydropower reservoir operations with multiple local optima[J],JOURNAL OF HYDROLOGY,2018,564:712-722
- [2]Wu, Xinyu, Li, Shuming, Cheng, Chuntian, Miao, Shumin, Ying, Qilin, CT (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China., Cheng, Minist Educ, Key Lab Ocean Energy Utilizat & Energy Conservat.Simulation-Optimization Model to Derive Operation Rules of Multiple Cascaded Reservoirs for Nas...[J],JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT,2019,145(5)
- [3]Wu, Xinyu, Cheng, Chuntian, Zeng, Yun, Lund, Jay R., CT (reprint author), Dalian Univ Technol, Dept Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..Centralized versus Distributed Cooperative Operating Rules for Multiple Cascaded Hydropower Res...[J],JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT,2016,142(11)
- [4]Wu Xin-Yu, Li Gang, Cheng Chun-Tian, Shen Jian-Jian, Luo Bin, Liao Sheng-Li, Cheng, CT (reprint author), Dalian Univ Technol, Fac Infrastruct Engn, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..A multi-objective short term hydropower scheduling model for peak shaving[J],INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS,2015,68:278-293
- [5]Wu X., Cheng C., Shen J., Chau K..Long-term hydropower optimal operation model for peak load regulating of typical days[A],2013,2190-2199
- [6]Zhou, Ling'an, Zhang, Zheng, Liao, Shengli, Cheng, Chuntian, Wu, Xinyu, Zhong, Ruhong, Shengli(shengliliao@dlut.edu.cn).Scheduling Method for Short-term Peak-shaving Operation and Unit Commitment of Cascade Hydropower...[J],Dianwang Jishu/Power System Technology,2020,44(2):454-464
- [7]张聪通, 张政, 武新宇, 程春田, 申建建.基于起调水位上限优化策略的水库弃水控制方法[J],水资源研究,2019,04:342-352
- [8]高寒, 申建建, 苏承国, 程春田, 武新宇.考虑回水效应的一库多级式水电站群短期优化调度模型[J],水资源研究,2019,03:248-259
- [9]Su, Chengguo, Cheng, Chuntian, Wang, Peilin, Shen, Jianjian, Wu, Xinyu, CT (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..Optimization model for long-distance integrated transmission of wind farms and pumped-storage h...[J],APPLIED ENERGY,2019,242:285-293
- [10]Wang, Jian, Cheng, Chuntian, Wu, Xinyu, Shen, Jianjian, Cao, Rui, CT (reprint author), Dalian Univ Technol, Minist Educ, Key Lab Ocean Energy Utilizat & Energy Conservat, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..Optimal Hedging for Hydropower Operation and End-of-Year Carryover Storage Values[J],JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT,2019,145(4)
- [11]程春田, 武新宇, 申建建, 李刚, 廖胜利, 刘本希.亿千瓦级时代中国水电调度问题及其进展[J],水利学报,2019,50(1):112-123
- [12]吴洋, 苏承国, 周彬彬, 蒋燕, 赵珍玉, 申建建, 武新宇.考虑日前市场的梯级水电站月度合约电量优化分解模型[J],水力发电,2019,45(12):75-79,104
- [13]Liu, Benxi, Cheng, Chuntian, Wang, Sen, Liao, Shengli, Chau, Kwok-Wing, Wu, Xinyu, Li, Weidong, SL (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..Parallel chance-constrained dynamic programming for cascade hydropower system operation[J],ENERGY,2018,165:752-767
- [14]Cheng, Chuntian, Su, Chengguo, Wang, Peilin, Shen, Jianjian, Lu, Jianyu, Wu, Xinyu, CG (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..An MILP-based model for short-term peak shaving operation of pumped-storage hydropower plants s...[J],ENERGY,2018,163:722-733
- [15]Niu, Wen-jing, Feng, Zhong-kai, Cheng, Chun-tian, Wu, Xin-yu, ZK (reprint author), Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Hubei, Peoples R China..A parallel multi-objective particle swarm optimization for cascade hydropower reservoir operati...[J],APPLIED SOFT COMPUTING,2018,70:562-575
- [16]张利升, 武新宇, 曹瑞, 王学敏, 严凌志, 程春田.多受端梯级水电站厂网多目标协调优化调度模型[J],电网技术,2018,12:3935-3940
- [17]武新宇, 应其霖, 廖胜利, 申建建.梯级水电站群短期发电调度计划快速生成方法[J],水资源研究,2018,03:236-250
- [18]王健, 程春田, 申建建, 武新宇, 曹瑞.水电站群优化调度非线性全局最优方法[J],中国电机工程学报,2018,38(17):5107-5117
- [19]申建建, 程春田, 武新宇, 李秀峰.超大规模水电系统优化调度挑战及应用实践[J],中国电机工程学报,2018,21:6284-6294+6490
- [20]Feng, Zhong-kai, Niu, Wen-jing, Cheng, Chun-tian, Wu, Xin-yu, ZK (reprint author), Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Hubei, Peoples R China..Optimization of large-scale hydropower system peak operation with hybrid dynamic programming an...[J],JOURNAL OF CLEANER PRODUCTION,2018,171:390-402