location: Current position: Home >> Scientific Research >> Paper Publications

Study on Mass Concrete Slab Construction Technology of Dalian World Finance Center

Hits:

Indexed by:会议论文

Date of Publication:2011-12-17

Included Journals:EI、CPCI-S、Scopus

Volume:137

Page Number:175-+

Key Words:super high-rise buildings; slab mass concrete; mix proportion; temperature difference controlled; temperature measurement

Abstract:Through the research on the mass concrete slab construction technology of Dalian World Finance Center, this paper has systematically summarized the integrated construction technology of super high-rise mass concrete slab, including key issues such as mix design technology, pouring time selection, construction elements and temperature testing technology. The one-time continuous pouring of 8000m(3)'s concrete requires about 66 hours and no temperature cracks appear in the concrete surface. A number of similar engineering practices indicate that the maximum adiabatic temperature rise is mainly subjected to the control of concrete mix composition and internal and the temperature difference between inside and outside is mainly controlled by the moisture and insulation measures, which are the two major critical factors controlling mass concrete slab temperature cracks, providing references to future similar mass concrete construction.

Pre One:Sensing Methodologies and Sensor Networks for Health Monitoring of Civil Infrastructures

Next One:Analysis on Overall Design of the Main Bridge of Dalian South Binhai Avenue