武新宇
个人信息Personal Information
教授
博士生导师
硕士生导师
性别:男
毕业院校:大连理工大学
学位:博士
所在单位:水利工程系
学科:水文学及水资源. 水利水电工程
联系方式:wuxinyu@dlut.edu.cn
电子邮箱:wuxinyu@dlut.edu.cn
扫描关注
- [41]冯仲恺, 程春田, 武新宇, 牛文静, Cheng, Chuntian(ctcheng@dlut.edu.cn).梯级水库群优化调度精英集聚蛛群优化方法[J],水利学报,2016,47(6):826-833
- [42] Xin-yu Wu., Jia-yang Wang, Chun-Tian Cheng.Hydro Unit Commitment With a Head-Sensitive Reservoir and Multiple Vibration Zones Using MILP[J],IEEE,2016,4842 - 4852
- [43]曹璐, 武新宇, 过团挺, 程春田, 史艳铃, 贾思阳.基于CFS预报产品的水电站水库预泄决策方法[J],水电能源科学,2016,34(2016年01期):53-56
- [44]Liu, Benxi, Liao, Shengli, Cheng, Chuntian, Wu, Xinyu.A Multi-Core Parallel Genetic Algorithm for the Long-Term Optimal Operation of Large-Scale Hydr...[A],2016,220-230
- [45]刘康, 程春田, 蔡建章, 陈孚, 武新宇.小水电与大中型水电分区输电限制优化调度模型[J],中国电机工程学报,2016,36(13):3488-3497
- [46]牛文静, 武新宇, 冯仲恺, 郭有安, 申建建, 程春田.耦合调峰和通航需求的梯级水电站多目标优化调度混合搜索方法[J],中国电机工程学报,2016,36(9):2331-2341
- [47]吴慧军, 程春田, 武新宇, 李秀峰, 蔡华祥.考虑小水电出力不确定性的小水电与大中型水电站群短期联合调度方法[J],中国电机工程学报,2016,36(21):5879-5889
- [48]刘本希, 武新宇, 程春田, 李秀峰, 蔡华祥, Cheng, Chuntian(ctcheng@dlut.edu.cn).大小水电可消纳电量期望值最大短期协调优化调度模型[J],水利学报,2015,46(12):1497-1505
- [49]Liao, Shengli, Li, Gang, Wu, Xinyu, Wang, Jiayang, Zhifu, G (reprint author), Dalian Univ Technol, Inst Hydropower Syst & Hydroinformat, Dalian 116024, Peoples R China..Modeling and Optimization of the Medium-Term Units Commitment of Thermal Power[J],ENERGIES,2015,8(11):12848-12864
- [50]王森, 武新宇, 程春田, 李保健.梯级水电站群长期发电优化调度多核并行机会约束动态规划方法[J],中国电机工程学报,2015,35(10):2417-2427
- [51]Niu W., Wu X., Feng Z., Shen J., Cheng C..Model of long-term optimal operation of a multi-reservoir system under the cascade storage energy...[A],2015,1962-1970
- [52]Wu, Huijun, Cheng, Chuntian, Xinyu, Li, Xiufeng, Cai, Huaxiang, Jianzhang.A Short-Term Scheduling Method of Small and Large Hydropower Coordination of China's Electric P...[A],2015,1896-1903
- [53]Cheng, Chun-Tian, Wu, Xin-Yu, Xiong, Shen, Jian-Jian, CT (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..Short-term peak shaving operation for multiple power grids with pumped storage power plants[J],INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS,2015,67:570-581
- [54] et al., Jian-Jian Shen , Chun-Tian Cheng, Xin-Yu Wu.A multi-objective short term hydropower scheduling model for peak shaving[J],INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS,2015,278-293
- [55]Niu, Wenjing, Shen, Jianjian, Cheng, Chuntian, Wu, Xinyu, Feng, Zhongkai.The Model of Long-Term Optimal Operation of Multi-reservoir System Under the Cascade Storage En...[A],2015,1962-1970
- [56][8]. Chun-Tian Cheng, Xiong-Cheng, Jian-Jian Shen, Xin-Yu Wu.Short-term peak shaving operation for multiple power grids with pumped storage power plants[J],International Journal of Electrical Power and Energy Systems,2014,67:570-581
- [57]王森, 李保健, 武新宇, 程春田, Cheng, C., Institute of Hydropower, Hydroinformation, Dalian University of TechnologyChina.自适应混沌整体退火遗传算法在水电站群优化调度中的应用[J],水力发电学报,2014,33(5):63-71
- [58]王森, 程春田, 武新宇, 李保健.自适应混沌整体退火遗传算法在水电站群优化调度中的应用[J],水力发电学报,2014,2014年05期:63-71
- [59]李保健, 程春田, 武新宇, 王森.日径流预报贝叶斯回声状态网络方法[J],中国科学:技术科学,2014,2014年09期:1004-1012
- [60]Shen, Jianjian, Cheng, Chuntian, Wu, Xinyu, Xiong, Li, Weidong, Lu, Jianyu, CT (reprint author), Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China..Optimization of peak loads among multiple provincial power grids under a central dispatching au...[J],26th International Conference on Efficiency, Cost, Optimization, Simulation and Environmental Impact of Energy Systems (ECOS),2014,74(C):494-505